The Arizona Journeyman Electrician Exam, Explained
Search for the arizona journeyman electrician exam and you will find prep for a license Arizona does not issue. Start here: Arizona has no state-level journeyman or master electrician license for individuals. The Arizona Registrar of Contractors (ROC) licenses businesses, not the electricians who work for them. This page covers the real test: the ROC electrical contractor trade exam, plus the Statutes and Rules Exam every qualifying party has to pass.
- The twist: there is no Arizona journeyman license
- The exam format: trade exam plus the SRE
- Who runs it
- Who qualifies and what it costs
- What's tested
- Which NEC edition the exam uses
- The NASCLA alternative
- Open book and exam-day rules
- Worked examples: the math the exam rewards
- Renewal and continuing education
- How to study for it
The Twist: There Is No Arizona Journeyman License
Arizona does not run the apprentice to journeyman to contractor ladder at the state level:
- No state journeyman, master, or apprentice card exists. The ROC licenses contractor businesses. On the ROC classifications page, a contractor's license belongs to the business, not to the qualifying party, and it can be issued to a sole proprietorship, partnership, LLC, or corporation.
- You work under a licensed contractor. Individual electricians in Arizona work as employees under a licensed electrical contractor's license. No state individual license is required to start or work in the trade.
- Journeyman status is local or program-level. Where it is documented at all, it comes from a city rule or an apprenticeship program like a JATC, not from the state. Do not treat one program's hours as a statewide rule.
- The person who tests is the qualifying party. That is the regularly employed person who answers to the ROC for the business's license.
So if your goal is to get licensed in Arizona, aim at the contractor exam. Your years in the trade are the experience the ROC counts.
The Exam Format
There are two requirements, and both must be satisfied unless a waiver applies. You must pass each at 70%.
| Trade Exam (PSI) | Statutes and Rules Exam (SRE) | |
|---|---|---|
| Questions | 110 scored | Training course followed by an exam; ROC does not publish a question count |
| Time | 240 minutes (4 hours) | Self-paced course, online only |
| Passing score | 70% | 70% |
| Format | Multiple choice, open book, at a PSI test center or online with a remote proctor | Computer-based, open book, online only through GMetrix |
| Fee | $66 for one exam | $61 through GMetrix |
Do the pacing math: 110 questions in 240 minutes is about 2 minutes 11 seconds per question, and PSI may include unscored trial questions that use the same clock. Workable if you can find answers in the book. It disappears fast if you are reading the book for the first time.
Older prep sites still describe a separate PSI Business Management exam. That is outdated. It was replaced by the SRE, which covers Arizona Revised Statutes Title 32, Chapter 10 and Arizona Administrative Code Title 4, Chapter 9.
Who Runs the Exam
Licenses are issued by the Arizona Registrar of Contractors (ROC), in Phoenix. The trade exam is administered by PSI, online or at a PSI testing center. The SRE is delivered online only through GMetrix.
- Pick your classification and name a qualifying party on your ROC application.
- The qualifying party completes the SRE training course and exam through GMetrix.
- The qualifying party sits the trade exam through PSI, unless a waiver applies.
- Submit your passing results with the rest of your application, bond, and fees.
The document that controls test day is the current PSI Candidate Information Bulletin for Arizona contractors, plus the PSI outline for your classification. If a prep site disagrees with the bulletin, the bulletin wins.
Who Qualifies & What It Costs
The electrical classifications are:
- R-11 Electrical (residential specialty): install and repair residential electrical systems.
- C-11 Electrical (commercial specialty): install, alter, and repair wiring and electrical material and equipment used in generating, transmitting, or utilizing electrical energy under 600 volts.
- CR-11 Electrical (dual): allows the scopes of both C-11 and R-11. CR-11 candidates take the C-11 trade exam.
For the qualifying party:
- Experience: 4 years of hands-on or managerial electrical experience for R-11, C-11, and CR-11, with at least 2 of those years within the last 10 years. That 4-year figure belongs to the contractor qualifying party. It is not a journeyman rule.
- Background check: the ROC is authorized to run a criminal-history check before issuing or renewing a license.
- Bond: a contractor's license bond is required. Amounts scale with classification and anticipated volume, so check the current ROC schedule for your classification instead of copying a single figure from a prep site.
- Exam fees: $66 to PSI for one trade exam, and $61 to GMetrix for the SRE. License and application fees are separate and vary by classification. Confirm them on the ROC fee schedule before you pay.
Waivers: the ROC may waive the trade exam under A.A.C. R4-9-106(E) for a qualifying party who was licensed in the same or a comparable classification in another state within the preceding five years. Arizona has no blanket reciprocity agreement. The SRE is generally still required, because it covers Arizona-specific law.
What's Tested
PSI publishes the content outline for each exam, so study to it. Both exams have 110 scored questions, but the weight shifts:
| Topic | R-11 | C-11 / CR-11 |
|---|---|---|
| Services, feeders, and branch circuits | 18 | 13 |
| Grounding and bonding | 16 | 13 |
| Raceways and boxes | 15 | 10 |
| Conductors and cables | 12 | 12 |
| Photovoltaics | 10 | 10 |
| Special occupancies and equipment | 3 | 13 |
| Overcurrent protection | 7 | 8 |
| General electrical knowledge | 6 | 5 |
| Lighting | 6 | 3 |
| Fire detection and alarm systems | 5 | 5 |
| Safety | 5 | 5 |
| Motors | 3 | 5 |
| Low voltage | 2 | 5 |
| Electrical devices | 2 | 2 |
| Illuminated signs | — | 1 |
Open your Code book to Article 210 for branch circuits, Article 220 for load calculations, Article 230 for services, Article 240 for overcurrent protection, Article 250 for grounding and bonding, Article 300 and Article 310 for wiring methods and conductors, Article 314 for boxes, Article 430 for motors, and Article 690 for photovoltaics. On the R-11, services, grounding, and raceways and boxes alone are 49 of 110 questions. On the C-11, add special occupancies as a top block. Weight your study that way.
🔎 The lookup tip that matters most for Arizona: you get about 2 minutes per question, trial questions included in the clock, and you are testing on an older edition than most new material uses. Tab your 2017 Code book by article number, and drill timed reps where every question starts with "find it in the book." Tab your Code book →
Which NEC Edition the Exam Uses
PSI's outline for the ROC trade exam, revised June 8, 2023, grades code questions on the 2017 NEC. Study and tab the 2017 edition for this test.
- The NEC is not adopted at state level in Arizona. Each municipality adopts and amends its own edition for enforcement, so the edition you work under in Phoenix, Tucson, or another city can be newer than the edition you test on.
- Do not drill on 2020 or 2023 rules for the ROC exam. An answer that is right under a different edition can be wrong here. In the 2017 book, the main ampacity table is Table 310.15(B)(16), not Table 310.16.
- Tell your testing facility's paperwork the final word: confirm the edition on your PSI outline before test day.
Edition mistakes are silent killers. Study the edition you will be tested on. See the 50-state edition table →
The NASCLA Alternative
The ROC also accepts the NASCLA Accredited Trade Examination for Electrical Contractors as an alternative to the Arizona trade exam. It is a different exam: 100 questions, 270 minutes, and it allows the 2020 or 2023 NEC book. Do not merge its numbers with the ROC exam's 110 questions, 240 minutes, and 2017 NEC. Take NASCLA if you expect to use the pass in other states. Take the ROC exam if Arizona is your only state. Either way, you still complete the SRE.
Open Book & Exam-Day Rules
The trade exam is open book, within PSI's reference rules:
- Allowed references for the ROC exam: the 2017 NEC, NFPA 72 (2016), and OSHA 29 CFR 1926. Only the listed books. A study guide that is allowed on the NASCLA exam is not automatically allowed here.
- Use permanent tabs only. You cannot write in your books during the exam.
- Bring a silent, nonprinting, non-programmable calculator.
- The SRE is open book too, but it is a training course and exam online through GMetrix, not a test-center exam.
Confirm the current reference list and rules in the PSI Candidate Information Bulletin before your test date. The bulletin is the source the proctor enforces.
Worked Examples: The Math the Exam Rewards
Two question styles show up over and over. Both are free points once the method is automatic.
Example 1 — Continuous loads [Article 210]: A branch circuit supplies a continuous load of 40 amperes. What is the minimum conductor ampacity required before derating? Continuous loads are sized at 125%: 40 A × 1.25 = 50 amperes. Open your Code book to Article 210, 210.19(A)(1), then check ampacity in the 2017 book at Table 310.15(B)(16). The trap answer is 40. The exam wants the 125% step.
Example 2 — Box fill [Article 314]: A 4″ square box, 1½″ deep, contains four 12 AWG circuit conductors, two 12 AWG equipment grounding conductors, one duplex receptacle, and two internal cable clamps. Is the box big enough? Per Table 314.16(B), 12 AWG = 2.25 in³ per allowance: 4 conductors × 2.25 = 9.00 in³; all the grounds together count once = 2.25 in³; the receptacle yoke counts twice = 4.50 in³; all the internal clamps together count once = 2.25 in³. Total: 18.00 in³ — exactly the 18.0 in³ volume Table 314.16(A) gives that box. It fits, with zero room to spare. Full box fill walkthrough →
The skill tested is knowing which table to open, in the right edition. That is drilled, not memorized.
Renewal & Continuing Education
Contractor licenses expire every 2 years. Arizona contractors have no state continuing-education requirement for renewal. A city, employer, or apprenticeship program may still require more locally.
How to Study for It
Field hours get your application approved. They do not pass an open-book exam on an older Code edition. Most candidates who fail, fail on lookup speed. The plan:
- Tab your 2017 Code book by article and drill finding any article in under 60 seconds. The tabbing guide →
- Do lookup reps with the book open. Sparky's 1,087 questions across 33 NEC topics are built exactly this way: every question a rep, 15 minutes a day. Set Sparky to the 2017 edition for Arizona. The method →
- Weight services, grounding, and photovoltaics. Services and grounding are the top blocks on both exams, and photovoltaics is 10 questions on each, more than most candidates expect. Add box fill (314.16) to your rotation for the raceways and boxes block.
- Do not skip the SRE. It covers Arizona law, not the NEC. Give the Title 32, Chapter 10 material real study time.
- Take the free 10-question practice test to see where you stand before PSI has your $66.
Exam facts verified against the Arizona Registrar of Contractors, the PSI Arizona contractor bulletin and the R-11 and C-11/CR-11 content outlines (rev. June 8, 2023), November 2026. Fees and rules change — confirm against the current ROC fee schedule and PSI bulletin before your test date.
Keep Drilling
Arizona gives you no journeyman shortcut. The contractor exam is the gate, and it is an open-book speed test on the 2017 NEC. Sparky's 1,087 codebook-first questions drill that speed: every question a rep, book open, 15 minutes a day.