State guides · Ohio
The Ohio Journeyman Electrician Exam, Explained
Search for the ohio journeyman electrician exam and you will find sites ready to sell you prep for a license Ohio does not issue. Start here instead: Ohio has no statewide journeyman or master electrician license. Ohio Revised Code Chapter 4740 defines a state license as a contractor license only. The state licenses electrical contractors for commercial work, through the Ohio Construction Industry Licensing Board (OCILB). This page covers that real exam: format, fees, experience, and the NEC edition it tests on.
- The twist: there is no Ohio journeyman license
- The exam format: two parts, both 70% to pass
- Who runs it
- Who qualifies and what it costs
- What's tested
- Which NEC edition the exam uses
- Local journeyman cards: city by city
- Open book and exam-day rules
- Worked examples: the math the exam rewards
- Renewal and continuing education
- How to study for it
The Twist: There Is No Ohio Journeyman License
Ohio does not run the apprentice to journeyman to contractor ladder at the state level:
- No state journeyman or master card exists. ORC 4740.01 defines "license" only as a contractor license: electrical, HVAC, refrigeration, plumbing, and hydronics. There is no journeyman category in the statute.
- The state license covers commercial work only. The OCILB's own examination application says the board issues licenses to contractors "who perform commercial work." The statute's definition of a construction project excludes residential buildings, so the state license does not govern residential-only work.
- Journeyman licensing, where it exists, is local. A few cities issue their own journeyman cards. Most do not. See the local section below.
- The license belongs to a person, assigned to one company. Your license and your liability insurance must both be assigned to a single contracting company. You cannot freelance the state license across companies.
So if your goal is to get licensed in Ohio, aim at the Electrical Contractor exam. Your years in the trade still matter. They are the experience the Board counts before it lets you sit.
The Exam Format
There are two parts, both computer-based, both open book, both given by PSI after the Board approves you. You must pass each part at 70%. Passing one part does not carry the other.
| Electrical Contractor | Business & Law | |
|---|---|---|
| Questions | 100 scored, plus 10 unscored pretest items | 50 scored, plus 5 unscored pretest items |
| Time | 4 hours | 2 hours |
| Passing score | 70% | 70% |
| Format | Multiple choice, on a computer at a PSI test center, open book | Multiple choice, open book, reference provided at the center |
| PSI fee | $69 per exam registration | $69 per exam registration |
Do the pacing math: 100 scored questions in 240 minutes is 2 minutes 24 seconds per question, and the pretest items eat into that same clock. Workable if you can find answers in the book. It disappears fast if you are reading the book for the first time. Older pages list 5 hours for the electrical part. The current PSI bulletin says 4. Plan for 4.
⚠️ Fail a part, and you wait. Per the PSI bulletin, a candidate who fails a part waits 60 days before retesting that part, and can retest up to five times in a year before having to reapply. Pass the first time. Drill the lookup reps until finding answers is boring.
Who Runs the Exam
Licenses are issued by the Ohio Construction Industry Licensing Board (OCILB), in the Division of Industrial Compliance, Ohio Department of Commerce, 6606 Tussing Road, Reynoldsburg, OH 43068. Board pre-approval is required before you schedule anything:
- Submit the OCILB examination application with your proof of experience and the $25 application fee.
- The Board reviews it and approves you. That approval is valid for one year.
- After approval, get your BCI and FBI background checks done before you sit for the exam.
- Only then do you schedule with PSI.
The document that controls your test day is the current PSI Candidate Information Bulletin for the OCILB. If a prep site disagrees with the bulletin, the bulletin wins.
Who Qualifies & What It Costs
Per the OCILB examination application, you must be:
- 18 or older, a U.S. citizen or a legal alien with proof, and never convicted of a disqualifying offense (S.B. 337).
- Experienced, one of two routes: a tradesperson in the electrical trade for not less than 5 years immediately prior to your application, or a currently registered Ohio engineer with 3 years of business experience in the electrical trade.
The 5-year route is documented, not just claimed: five consecutive years of tax records (W-2s or Schedule C), plus proof such as at least one permit per year obtained by the licensed contractor you worked under, an active journeyman card, or an apprenticeship completion certificate from an Ohio-approved or U.S. Department of Labor program. The Board decides what counts.
- Application fee: $25, with your OCILB examination application.
- Exam fees: $69 to PSI for each exam registration, electrical and Business & Law.
- License fee: $25 after you pass both parts, by check to "Treasurer, State of Ohio," per the application.
- Insurance: proof of at least $500,000 in contractor liability insurance, assigned to your contracting company, before the license is issued.
Do not copy fee numbers off generic prep sites. Several mix the $25 license fee up with the exam fee. Confirm the numbers above on the current application and PSI bulletin before you pay.
What's Tested
The PSI outline for the electrical part is published, so study to it. The 100 scored questions break down like this:
| Topic | Questions |
|---|---|
| General electrical knowledge | 10 |
| Transformers and equipment | 12 |
| Service, feeders, and branch circuits | 16 |
| Raceways, boxes, and panelboards | 10 |
| Conductors and cables | 12 |
| Control devices | 8 |
| Motors and generators | 12 |
| Utilization equipment | 8 |
| Special occupancies and equipment | 12 |
Open your Code book to Article 210 for branch circuits, Article 220 for load calculations, Article 230 for services, Article 240 for overcurrent protection, Article 250 for grounding and bonding, Article 300 and Article 310 for wiring methods and conductors, Article 314 for boxes, Article 430 for motors, and Article 450 for transformers. Services, feeders, and branch circuits are the biggest block. Weight your study that way.
The Business & Law part is not a Code test. It runs on the NASCLA Contractors Guide to Business, Law and Project Management, Ohio edition: business organization, licensing, estimating, contracts, insurance and bonding, OSHA, taxes, and lien laws. Study only the NEC and you walk in blind on 50 of the 150 questions you have to pass.
🔎 The lookup tip that matters most for Ohio: you get 2 minutes 24 seconds per electrical question, pretest items included in the clock. Tab your Code book by article number, and drill timed reps where every question starts with "find it in the book." Tab your Code book →
Which NEC Edition the Exam Uses
PSI's reference list for this exam is the 2023 NEC (NFPA 70). Ohio adopted the 2023 NEC effective March 1, 2024 for commercial work, and April 15, 2024 for residential work under the Residential Code of Ohio, with Ohio modifications.
- Study and tab the 2023 NEC.
- Do not drill on 2020 or 2026 rules for this test. An answer that is right under a different edition can be wrong here.
- The electrical part also allows Ugly's Electrical References, 2023, and an electrical field reference handbook. The Business & Law reference is provided at the testing center.
Edition mistakes are silent killers. Study the edition you will be tested on. See the 50-state edition table →
Local Journeyman Cards: City by City
Because there is no state journeyman license, journeyman rules in Ohio are a local patchwork:
- Toledo issues its own Journeyman Electrician License through its Division of Building Inspection, with its own experience and city exam requirements. Toledo's rule is not a statewide standard.
- Columbus, Cleveland, and Cincinnati generally do not issue a journeyman card. Electricians there work under a state-licensed electrical contractor, and contractors register locally.
- Other cities, like Middletown and Hamilton, are cited as requiring local journeyman licensing or registration.
The trap is treating any one city's rule as Ohio's rule. There is no Ohio rule. Check the building department where you will work.
Open Book & Exam-Day Rules
Both parts are open book, within PSI's reference rules:
- Electrical part: bring your 2023 NEC or NEC Handbook, Ugly's Electrical References 2023, and an allowed field reference handbook.
- Business & Law part: the reference is provided in the testing center.
- References may be highlighted, underlined, and tabbed or indexed before the session. They may not be written in, and loose or attached papers are not allowed.
- Your score is given at the center when you finish. A fail report carries diagnostic information by topic.
Confirm the current reference list and rules in the PSI Candidate Information Bulletin before your test date. The bulletin is the source the proctor enforces.
Worked Examples: The Math the Exam Rewards
Two question styles show up over and over. Both are free points once the method is automatic.
Example 1 — Continuous loads [Article 210]: A branch circuit supplies a continuous load of 40 amperes. What is the minimum conductor ampacity required before derating? Continuous loads are sized at 125%: 40 A × 1.25 = 50 amperes. Open your Code book to Article 210, 210.19(A)(1), then check ampacity in Table 310.16. The trap answer is 40. The exam wants the 125% step.
Example 2 — Box fill [Article 314]: A 4″ square box, 1½″ deep, contains four 12 AWG circuit conductors, two 12 AWG equipment grounding conductors, one duplex receptacle, and two internal cable clamps. Is the box big enough? Per Table 314.16(B), 12 AWG = 2.25 in³ per allowance: 4 conductors × 2.25 = 9.00 in³; all the grounds together count once = 2.25 in³; the receptacle yoke counts twice = 4.50 in³; all the internal clamps together count once = 2.25 in³. Total: 18.00 in³ — exactly the 18.0 in³ volume Table 314.16(A) gives that box. It fits, with zero room to spare. Full box fill walkthrough →
The arithmetic is trivial. The skill tested is knowing which table to open. That is drilled, not memorized.
Renewal & Continuing Education
OCILB licensees can renew annually or every three years. Continuing education is 8 hours for a 1-year renewal or 24 hours for a 3-year renewal, with at least half in code, under OAC 4101:16. Use OCILB-approved providers.
How to Study for It
Field hours get your application approved. They do not pass a two-part open-book exam. Most candidates who fail, fail on lookup speed and on Business & Law questions they never studied. The plan:
- Tab your 2023 Code book by article and drill finding any article in under 60 seconds. The tabbing guide →
- Do lookup reps with the book open. Sparky's 1,087 questions across 33 NEC topics are built exactly this way: every question a rep, 15 minutes a day. The method →
- Weight services and calculations. Service, feeders, and branch circuits are 16 of the 100 electrical questions, the biggest single block. Add box fill (314.16) and motor calculations to your rotation.
- Do not skip Business & Law. Give the NASCLA Ohio guide real study time. It is a full second exam, not an afterthought.
- Take the free 10-question practice test to see where you stand before PSI has your $69.
Exam facts verified against the OCILB examination application, ORC Chapter 4740, OAC 4101:16, and the current PSI Candidate Information Bulletin, November 2026. Fees and rules change — confirm against the current application and bulletin before your test date.
Keep Drilling
Ohio gives you no journeyman shortcut. The contractor exam is the gate, and it is an open-book speed test. Sparky's 1,087 codebook-first questions drill that speed: every question a rep, book open, 15 minutes a day.